Hello CDD Supervisors and John,


Recent Morris Bridge Road turn lane extension (Northbound) into CLI appeared to be an incomplete job because it lacked additional left turn arrow(s) for the extension. On following up the matter I was able to have the traffic division agree to come out repaint it. However the original thermoplastic markings will still be visible. Attached is the new drawing and a note from the traffic Engineer. Please review it and post it on this platform so that I can request him to move it forward or hold it off.

Quote

Sudhir – here is my mark-up for the 3rd additional “left turn arrow” with 6” white line extended south. Those pavement markings grinded will not change and what you see removed will always never look new unless the pavement surface is replaced from a mill and resurface operation.



Mike Flick

Michael B. Flick, P.E.
Engineer
Public Works Department/Technical Services Division
Traffic Engineering
Engineering and Operations

Unquote


Have a safe weekend.

Sudhir (Sid) Shah


Attachments:
Morris Bridge Markup_Flick (1).pdf [1.36 MiB]
Downloaded 1654 times
Fri Mar 27, 2020 4:41 pm
Profile
This topic is locked, you cannot edit posts or make further replies.  Go to page: 1


Search for:
cron
Powered by The Sunshine Board & phpBB